Job Title
Poland
Client
MEWO
Year
2023
Value
£600,000
Project Overview
Liveaboard nearshore project based 20km from Ustka Port, Poland in the Baltic Sea for a developing wind farm project. Two separate moonpools set up with SRS ML Duo drilling rig completing 6 no. 55m boreholes with continuous sonic sampling and in-situ testing. The other completing 6 no. Top- Push CPT’s to 55m below seabed. On this project MacGeo delivered the entire project specification with on-site project management throughout.
Project Highlights
The project was delivered perfectly with an ‘above and beyond attitude’ as we went beyond the clients’ expectations and delivered more than the specification required. All boreholes and CPT’s achieved target depths with full recovery. Project was delivered in such good time, that additional locations where added.